California's ADU laws have made backyard units one of the highest-leverage property improvements an LA homeowner can make. We design and build all three types — detached new builds, attached additions, and JADUs (Junior ADUs converted from existing space). End to end. Permits, plans, foundations, framing, finishes, and final inspections, all under one roof. You work directly with Onn from feasibility study through certificate of occupancy.

ADU Construction in Los Angeles specifically for Westwood

Every neighborhood has its own architectural character, permit jurisdiction, and finish-level expectations. Here's how we approach adu construction in los angeles in Westwood specifically.

Condo HOA realities

Most Westwood condos require HOA approval before construction starts. This adds 4–8 weeks to the timeline. We coordinate the HOA submission and answer their questions during their review.

Construction hours

Most condos limit construction to weekdays, 9 AM–5 PM. We schedule projects accordingly — slower than a single-family pace but predictable.

Single-family south of Wilshire

Standard mid-century homes here often have aging electrical, original plumbing, and tight footprints. We plan for systems modernization during any kitchen/bath project.

What we handle

Feasibility & site planning

Lot review, setbacks, height limits, utility access, soil assessment. We tell you up front whether your project pencils — square footage, code constraints, expected timeline.

Architectural design

Floor plans, elevations, 3D renderings. We design to maximize functional space within California's ADU size limits (up to 1,200 sq ft detached, 850 sq ft for studios/1-bedroom).

Permits & utilities

Plan check submission, energy compliance (Title 24), structural engineering, separate or shared utility service. We deal with LADBS or your municipal building department.

Foundation, framing, finish

New foundations or attached construction, framing, MEP rough-in, exterior, and full interior finishes — kitchen, bath, flooring, HVAC, electrical.

Final inspection & C of O

Final inspections, Certificate of Occupancy, and walkthrough. We hand you a unit you can live in, rent, or use as a guest house.

Pricing in Westwood

$250k – $450k

Typical detached ADU build cost in Los Angeles, all-in (design, permits, construction, finishes, utility hookups). Attached ADUs typically run lower; JADUs converting existing space lower still.

LADBS handles Westwood permits. Condo projects require HOA approval before permits — 4–8 weeks added timeline. Condos may also require additional fire-suppression review.

Frequently asked

How big can my ADU be in Los Angeles? +

California state law allows detached ADUs up to 1,200 sq ft (or larger if your local jurisdiction permits). Attached ADUs are limited to 50% of the primary home's square footage or 1,200 sq ft, whichever is less. Junior ADUs (JADUs) are capped at 500 sq ft and must be inside the existing primary structure.

How long does an ADU project take? +

Plan to design and build a detached ADU in 9–14 months total: 2–3 months for design and permits, 6–10 months for construction. Attached ADUs and JADU conversions can run shorter.

Do you work in condos? +

Yes — condo remodels are a regular part of our work. We coordinate HOA approvals, freight-elevator scheduling, weekday-only construction, and protect adjacent units.

How long does a Westwood condo kitchen take? +

Add 4–8 weeks to the standard kitchen timeline for HOA approval. Total project typically 5–7 months from first conversation to final walkthrough.