Skip to main content

Whole-Home Remodeling in Los Angeles

20+ years. 390+ LA remodels, 67 published here with their final prices. Typical whole-home phased scope: 6–14 months across 2–3 phases with one accountable team.

When the whole home needs to come together — open up the floor plan, redo the kitchen and baths, add a primary suite, refinish floors, modernize systems — coordination is everything. We do whole-home remodels with a single project manager, a single design vision, and a single construction team. No handoffs between three different contractors. Onn personally runs every full-home project.

How this project runs, step by step

  1. Discovery + feasibility consult (2–3 hrs on site). Onn walks the whole house, reviews structural condition, plumbing/electrical age, roof + HVAC state, and gives an honest phasing recommendation + scope + timeline range.
  2. Design phase (6–10 weeks). Full architectural plans, structural engineering, energy-code compliance, phased material palettes. Long-lead spec locked before permit submittal.
  3. Permit + long-lead orders (6–12 weeks). LADBS or municipal submittal. Whole-home permits carry structural review; hillside + HPOZ overlays extend by 6–12 weeks each. Long-lead cabinets + stone + custom windows ordered in parallel.
  4. Build phase (4–10 months, phased). Demo → structural → rough MEP → close-up → finishes → punch. Phased so you can occupy one wing while another is being worked. Weekly walkthroughs + photo updates.
  5. Punch list + final walkthrough. Multi-phase punch list. Detailed handoff binder covering warranties, systems documentation, and maintenance schedule. Workmanship warranty covers 12 months on labor after final sign-off.

What we handle

Discovery & feasibility

Site walkthrough, structural assessment, what's realistic given your home's bones and your budget. We tell you what won't work before you fall in love with it.

Architectural design & permits

Full plans, structural engineering, energy compliance, permit submittals. Multi-room remodels almost always need a permit; we manage the process.

Structural & systems work

Wall removal, beam installation, foundation repair if needed, electrical service upgrade, HVAC, plumbing main runs, roof if relevant.

Kitchens, baths, and finishes

All the remodeling skills we bring to single-room projects, applied at scale. Cabinetry, tile, fixtures, finishes — coordinated across rooms for design consistency.

Project management

Weekly site meetings, milestone-based payment schedule, transparent change-order process. You always know where the project stands.

Typical price range

$35k – $440k
in Los Angeles

From our completed projects. Computed from 18 whole-home projects we have finished and closed out, which ran $36k-$440k with a median of $170.7k. Final prices from our own records. The lower end is a whole house touched but not taken back to framing; the upper end is a kitchen and several bathrooms rebuilt from the studs out with the electrical, plumbing and heating replaced.

Need help spreading payments? We work with Enhancify financing — prequalification doesn't affect your credit.

Frequently asked questions

How long does a whole-home remodel take? +

Cosmetic-level projects: 3–4 months. Heavy-structural projects (wall removal, primary suite addition, systems upgrade): 8–14 months. We give you a real timeline up front, not the optimistic one.

Do we need to move out? +

For most full-home remodels — yes, at least for the heaviest construction phase. We'll plan around your tenancy as much as possible, but living through wall removal and re-plumbing is rough on most families.

What's your fee structure? +

Fixed-price contract based on scope, with a transparent allowance line for finish materials so you can choose finishes during the project without budget guesswork. Change orders are documented and priced before any work proceeds.

How do you handle older LA homes (pre-1950)? +

Carefully. Older LA homes often surface lead paint, asbestos, knob-and-tube wiring, or galvanized plumbing. We test for hazardous materials before demo, plan abatement properly, and budget contingency for systems that need replacing.

Do you sequence the work so we can live-through, or do we need to move out? +

Depends on the scope. Cosmetic + kitchen-only whole-home work is often live-through-able if you can set up a temporary cooking space. Structural + primary-bath + systems-heavy work usually requires 4–8 weeks of moving out (short-term rental or family stay) during the loudest / dustiest phase. Onn walks you through the honest live-through vs move-out call in the discovery consult.

How do you handle change orders on a full-home job? +

Written change order for anything outside the signed scope, with cost + schedule impact clearly stated. Nothing proceeds until you sign. Discovered conditions (rotted framing, non-code wiring, previously-hidden plumbing) get flagged the day we find them — never rolled up in a surprise invoice at the end.

What clients say

5.0 ★★★★★ · 55 Google reviews · 75 Houzz reviews · real names, real homes

Read all 55 reviews on Google →
Shira Drori
Shira Drori
AUGUST 14, 2026
★★★★★

Onn was amazing he did our ADU remodel as well as multiple interior remodels for the kitchen, upstairs bedrooms and both bathrooms👏🏽Definitely a job well done would highly reccomend

Rotem Kalderon
Rotem Kalderon
AUGUST 14, 2026
★★★★★

I'm really enjoying working with Onn. He's doing an amazing project. Thanks!

‫יצחק טנדלר (טדי)‬‎
‫יצחק טנדלר (טדי)‬‎
JULY 15, 2026
★★★★★

Fantastic service and a great overall experience. I would definitely recommend them to friends and family.

Talk to Onn about your project.

Free consult, no obligation. Onn reads every inquiry personally — and aims to reply within one business day.

Get a free consultation for your kitchen, bathroom, or full home remodel in Los Angeles. We'll respond within one business day.

Licensed CSLB #1133368Fully Insured5.0 · 55 Google reviews

Ready to start?

Onn personally reviews every inquiry. We'll set up an in-home consultation to walk through your vision, scope, and a realistic budget — no obligation.

Send a message
Call Onn Point Free estimate »