+1 310 596 0296

Whole-Home Remodeling in Los Angeles in Westwood

Serving 90024 · 90025 and Bel Air, Brentwood, Century City

When the whole home needs to come together — open up the floor plan, redo the kitchen and baths, add a primary suite, refinish floors, modernize systems — coordination is everything. We do whole-home remodels with a single project manager, a single design vision, and a single construction team. No handoffs between three different contractors. Onn personally runs every full-home project.

Whole-Home Remodeling in Los Angeles specifically for Westwood

Every neighborhood has its own architectural character, permit jurisdiction, and finish-level expectations. Here's how we approach whole-home remodeling in los angeles in Westwood specifically.

Condo HOA realities

Most Westwood condos require HOA approval before construction starts. This adds 4–8 weeks to the timeline. We coordinate the HOA submission and answer their questions during their review.

Construction hours

Most condos limit construction to weekdays, 9 AM–5 PM. We schedule projects accordingly — slower than a single-family pace but predictable.

Single-family south of Wilshire

Standard mid-century homes here often have aging electrical, original plumbing, and tight footprints. We plan for systems modernization during any kitchen/bath project.

What we handle

Discovery & feasibility

Site walkthrough, structural assessment, what's realistic given your home's bones and your budget. We tell you what won't work before you fall in love with it.

Architectural design & permits

Full plans, structural engineering, energy compliance, permit submittals. Multi-room remodels almost always need a permit; we manage the process.

Structural & systems work

Wall removal, beam installation, foundation repair if needed, electrical service upgrade, HVAC, plumbing main runs, roof if relevant.

Kitchens, baths, and finishes

All the remodeling skills we bring to single-room projects, applied at scale. Cabinetry, tile, fixtures, finishes — coordinated across rooms for design consistency.

Project management

Weekly site meetings, milestone-based payment schedule, transparent change-order process. You always know where the project stands.

Pricing in Westwood

$200k – $1M

Typical LA whole-home remodel range. Lower end = cosmetic refresh + kitchen/bath. Higher end = structural redesign, primary suite addition, full systems modernization, and high-end finishes.

LADBS handles Westwood permits. Condo projects require HOA approval before permits — 4–8 weeks added timeline. Condos may also require additional fire-suppression review.

Frequently asked

How long does a whole-home remodel take? +

Cosmetic-level projects: 3–4 months. Heavy-structural projects (wall removal, primary suite addition, systems upgrade): 8–14 months. We give you a real timeline up front, not the optimistic one.

Do we need to move out? +

For most full-home remodels — yes, at least for the heaviest construction phase. We'll plan around your tenancy as much as possible, but living through wall removal and re-plumbing is rough on most families.

Do you work in condos? +

Yes — condo remodels are a regular part of our work. We coordinate HOA approvals, freight-elevator scheduling, weekday-only construction, and protect adjacent units.

How long does a Westwood condo kitchen take? +

Add 4–8 weeks to the standard kitchen timeline for HOA approval. Total project typically 5–7 months from first conversation to final walkthrough.

Live in Westwood?

Onn personally reviews every inquiry. Tell us about your project — Onn will be in touch within one business day.

Send a message